基于正比计数管的核反应堆初次装料监测系统研制

Development of a Nuclear Reactor First Fuel Loading Monitoring System Based on Boron Coated Proportional Counter

  • 摘要: 为了确保反应堆初次装料及换料过程的安全临界,防止堆芯装料过程发生临界事故,研制核反应堆初次装料系统。对系统探测器组件、监测机柜、测量通道机箱及吊装方案进行设计,并对系统进行实验验证。对涂硼正比计数管为核心的探测器组件进行耐压、密封结构设计,电缆设计采用一体化、高屏蔽性、抗干扰的方案,以保证信号传输稳定性。信号处理装置采用机柜、插件式机箱形式,实现信号调理、脉冲计数、报警显示、周期值计算及历史记录等功能,测量通道机箱信号处理与显示插件隔离设计进一步保证系统的可靠性。经测试验证,该系统耐水压密封性、辐射特性及稳定性可满足初次装料过程中子注量率监测要求,已应用于防城港核电站3、4号机组。

     

    Abstract: In order to ensure the effective supervision of safety criticality during the initial loading and refueling of the reactor and prevent critical accidents during the core loading, the primary loading system of the nuclear reactor is developed. The system detector assembly, monitoring cabinet, measuring channel cabinet and lifting scheme are designed in detail, and the system is fully tested and verified. The detector assembly with boron coated proportional counter tube as the core is designed with pressure resistance and sealing structure, and the integrated high shielding anti-interference cable design is adopted to ensure the stability of signal transmission. The signal processing device adopts the form of cabinet and plug-in box to realize the functions of signal conditioning, pulse counting, alarm display, cycle value calculation and historical record. The isolation design of the signal processing and display plug-in of the measurement channel box further ensures the reliability of the system. Through test and verification, the system’s water pressure tightness, radiation characteristics and stability can meet the requirements of neutron flux rate monitoring during the initial loading process. It has been applied to units 3 and 4 of Fangchenggang nuclear power station.

     

/

返回文章
返回